Shimna Integrated High School Recruitment Fair

Nu Line and Coras had great pleasure in attending the inaugural Shimna Integrated High School Recruitment Fair on March 8th2019. The event was well attended with 45 exhibitors present. Nu Line Coras JV staff met with students and prospective civil engineers, plant fitters, utility technicians and quantity surveyors from Year 10 through to Year 14…

Award Winners

Nu Line are delighted to have picked up the Kier and Phoenix Operations 2018 Contractor Excellence Award for works on the Phoenix Natural Gas ‘Gas to the East Project’ – Well done to Joe Doran and the team for recognition of their excellence in safety, health and environmental performance and compliance with quality, technical, safety…

PC15 NI Water Civil Engineering Framework – East Belfast Lead Pipe

NI Water has a 25 year programme to improve water quality by identifying and replacing lead pipes within its infrastructure. The Lead Pipe Replacement (LPR) projects are street by street upgrade of individual premises water supply pipe typically in areas of previous high density communication pipes. Nu Line Utilities are a resident contractor year PC15 Framework working with NI Water to replace an average of 1200 lead service pipes per annum.

Phoenix Natural Gas – Gas to the East Network Extension

The Phoenix Natural Gas, Gas to the East expansion is a 3 year trunk and distribution main project across County Down and was an integral part of the £58 Million, 13 town network rollout to 28,000 commercial and domestic customers. Nuline Utilities were appointed as Contractor for the provision of planning, procurement, construction, reinstatement, testing and commissioning of 20kms of trunk main and 20kms of distribution infill gas mains.